top of page
WASTEWATER TREATMENT AUTOMATION
A Supervision and Control System was implemented for Sabesp ETE Barueri Wastewater Treatment Plant during the increase in sewage treatment capacity to 12.5 cubic meter per second.
​
Redundant SCADA software, Oracle database and GE Fanuc programmable logic controllers (PLC) were installed and interconnected in a fiber optic fieldbus with an Ethernet TCP/IP protocol.
​
The communication between the PLCs and the field equipment (Electricity meter, frequency inverters, polymer preparation skid, gas system) was implemented in a communication network using an EIA485 serial port with Modbus RTU protocol.
Sem tÃtulo30
Sem tÃtulo33
WASTEWATER PLANT
Sem tÃtulo30
1/4
bottom of page